WISER-3rd Floor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
ACLS 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ACLS 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ACLS 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CL A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CL B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DB 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DB 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LBRY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LOBBY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MPL 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WISER-4th Floor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
4th PGM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CL C |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONF 4-A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DB 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 17 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MET 19 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Studio |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Visitin... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VR 4th ... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
CHP ED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHP Off... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHP PICU |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CHP SIM... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EAST |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
EAST Of... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EAST Si... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
Mercy 01 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 02 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 03 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 06 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 07 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 08 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 09 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy C... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy I... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercy N... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
MKS ACLS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS BAY... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS BAY 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS BAY... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS Cla... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS MET... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS MET 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MKS Off... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MWH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
MWH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MWH 1st... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MWH 4228 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MWH 4230 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MWH Off... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PASS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
PSV Off... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PSV-Cla... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PSV-CRAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PSV-LAB 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PSV-LAB 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PUH |
|
SDY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
SDY Off... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SDY-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SDY-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SMH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
SMH 203 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SMH 204 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SMH 206 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SMH In-... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SMH MET 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SMH MET 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SMH Off... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SON |
|
PUH-Watson |
|
PUH-NE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
PUH CL A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PUH CL B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PUH CL C |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PUH Roo... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PUH Roo... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WPH |
|
W-MD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
WM 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WM 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WM 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WM DB 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WM In-s... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WM Lobby |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Offsite |
|
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
CA1 Introduction to Anesthesiology Simulation 07:30 AM-04:00 PM
90 minutes setup time
60 minutes teardown time
Comments:
[CA1 ANES INTRO]
Expectations:
Space Requirements:
- CLA & B wall open
- 5 MET rooms
Resource Requirements:
- 1 Anesthesia machine in front of CLA
- 5 SimMan simulators
- 5 Anesthesia machines
- Basic & Advanced airway equipment per set-up document
- Pharmacy set-up in Main Control room, medications per set-up document
Substance Use Disorder in Hospice Patients 01:01 AM-12:00 PM
Comments:
[Hospice Substance Use DO]
EVMS SCSIL PETA Training 09:00 AM-12:00 PM
30 minutes setup time
Comments:
[EVMS SCSIL PETA Training ]
CA1 Introduction to Anesthesiology Simulation 07:30 AM-04:00 PM
90 minutes setup time
60 minutes teardown time
Comments:
[CA1 ANES INTRO]
Expectations:
Space Requirements:
- CLA & B wall open
- 5 MET rooms
Resource Requirements:
- 1 Anesthesia machine in front of CLA
- 5 SimMan simulators
- 5 Anesthesia machines
- Basic & Advanced airway equipment per set-up document
- Pharmacy set-up in Main Control room, medications per set-up document
First 5 Minutes: Module 1. What To Do Until the Code Team Arrives - St. Margaret's 10:30 AM-11:30 AM
30 minutes setup time
30 minutes teardown time
Comments:
[FIRST 5 MIN 1: CTA - SMH]
CA1 Introduction to Anesthesiology Simulation 07:30 AM-04:00 PM
90 minutes setup time
60 minutes teardown time
Comments:
[CA1 ANES INTRO]
Expectations:
Space Requirements:
- CLA & B wall open
- 5 MET rooms
Resource Requirements:
- 1 Anesthesia machine in front of CLA
- 5 SimMan simulators
- 5 Anesthesia machines
- Basic & Advanced airway equipment per set-up document
- Pharmacy set-up in Main Control room, medications per set-up document
Meeting 11:00 AM-12:00 PM
Comments:
[Meeting]
JABSOM MS3 Transition to Clerkship 08:00 AM-10:00 AM
15 minutes setup time
15 minutes teardown time
Comments:
[JABSOM MS3 Trans Clkshp]
JABSOM MS2 MD5 Medical Student Fundamental Acute Care Techniques 09:00 AM-03:30 PM
30 minutes setup time
30 minutes teardown time
Comments:
[JABSOM MS2 MD5 Sim FACTs]
3rd Year Medical Student Critical Care Medicine 08:00 AM-11:00 AM
30 minutes setup time
30 minutes teardown time
Comments:
[3RD YR CCM]
Expectations:
This is an 8 week block, of which sessions are conducted over 7 weeks. One week there is a double class which requires the wall between MET 10 and 11 to be opened and seating for up to 30 participants to be arranged.
On testing days, 2 debriefing rooms will be needed in addition to MET 10.
Facilitator or Scheduler, please list in comments which date is the double session, and which date/s is/are the testing dates.
Space Requirements:
- MET 10 and once a block MET 11
Resource Requirements:
- SimMan
- Crash cart
- Basic and Advanced airway equipment
JABSOM MS2 MD5 Medical Student Fundamental Acute Care Techniques 09:00 AM-03:30 PM
30 minutes setup time
30 minutes teardown time
Comments:
[JABSOM MS2 MD5 Sim FACTs]
New Hire Simulation- PSV 01:00 PM-03:00 PM
Comments:
[NHS PSV]
CA1 Introduction to Anesthesiology Simulation 07:30 AM-04:00 PM
90 minutes setup time
60 minutes teardown time
Comments:
[CA1 ANES INTRO]
Expectations:
Space Requirements:
- CLA & B wall open
- 5 MET rooms
Resource Requirements:
- 1 Anesthesia machine in front of CLA
- 5 SimMan simulators
- 5 Anesthesia machines
- Basic & Advanced airway equipment per set-up document
- Pharmacy set-up in Main Control room, medications per set-up document
ICU Crisis Response Training Program - Passavant 09:00 AM-11:00 AM
30 minutes setup time
30 minutes teardown time
Comments:
[ICU CRT - PSV]
Expectations:
Resources:
MET #1 with SimEssential
Code cart
Connect IV to simulator
Oxygen delivery equipment: nasal cannula, face mask, BVM
ICU Crisis Response Training Program - Passavant 09:00 AM-11:00 AM
30 minutes setup time
30 minutes teardown time
Comments:
[ICU CRT - PSV]
Expectations:
Resources:
MET #1 with SimEssential
Code cart
Connect IV to simulator
Oxygen delivery equipment: nasal cannula, face mask, BVM
CA1 Introduction to Anesthesiology Simulation 07:30 AM-04:00 PM
90 minutes setup time
60 minutes teardown time
Comments:
[CA1 ANES INTRO]
Expectations:
Space Requirements:
- CLA & B wall open
- 5 MET rooms
Resource Requirements:
- 1 Anesthesia machine in front of CLA
- 5 SimMan simulators
- 5 Anesthesia machines
- Basic & Advanced airway equipment per set-up document
- Pharmacy set-up in Main Control room, medications per set-up document
Neurology Clerkship PETA Assessment 08:00 AM-12:00 PM
Comments:
[Neuro Clerkship Assess]
Neurology Clerkship PETA Assessment 08:00 AM-12:00 PM
Comments:
[Neuro Clerkship Assess]
Neurology Clerkship PETA Assessment 08:00 AM-12:00 PM
Comments:
[Neuro Clerkship Assess]
Neurology Clerkship PETA Assessment 08:00 AM-12:00 PM
Comments:
[Neuro Clerkship Assess]
Neurology Clerkship PETA Assessment 08:00 AM-12:00 PM
Comments:
[Neuro Clerkship Assess]
CA1 Introduction to Anesthesiology Simulation 07:30 AM-04:00 PM
90 minutes setup time
60 minutes teardown time
Comments:
[CA1 ANES INTRO]
Expectations:
Space Requirements:
- CLA & B wall open
- 5 MET rooms
Resource Requirements:
- 1 Anesthesia machine in front of CLA
- 5 SimMan simulators
- 5 Anesthesia machines
- Basic & Advanced airway equipment per set-up document
- Pharmacy set-up in Main Control room, medications per set-up document
HeartCode Advanced Cardiac Life Support - Part 2 Skills 10:00 AM-10:30 AM
Comments:
[HC ACLS Part 2]
JABSOM MS3 Transition to Clerkship 08:00 AM-10:00 AM
15 minutes setup time
15 minutes teardown time
Comments:
[JABSOM MS3 Trans Clkshp]
JABSOM MS3 Transition to Clerkship 08:00 AM-10:00 AM
15 minutes setup time
15 minutes teardown time
Comments:
[JABSOM MS3 Trans Clkshp]
JABSOM MS2 MD5 Medical Student Fundamental Acute Care Techniques 09:00 AM-03:30 PM
30 minutes setup time
30 minutes teardown time
Comments:
[JABSOM MS2 MD5 Sim FACTs]
CA1 Introduction to Anesthesiology Simulation 07:30 AM-04:00 PM
90 minutes setup time
60 minutes teardown time
Comments:
[CA1 ANES INTRO]
Expectations:
Space Requirements:
- CLA & B wall open
- 5 MET rooms
Resource Requirements:
- 1 Anesthesia machine in front of CLA
- 5 SimMan simulators
- 5 Anesthesia machines
- Basic & Advanced airway equipment per set-up document
- Pharmacy set-up in Main Control room, medications per set-up document
JABSOM MS2 MD5 Medical Student Fundamental Acute Care Techniques 09:00 AM-03:30 PM
30 minutes setup time
30 minutes teardown time
Comments:
[JABSOM MS2 MD5 Sim FACTs]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
Women and Under Represented Minority Summer Scholar Program 10:00 AM-03:00 PM
Comments:
[WURM Scholar]
Women and Under Represented Minority Summer Scholar Program 10:00 AM-03:00 PM
Comments:
[WURM Scholar]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
EVMS SCSIL Maintenance 12:00 AM-11:45 PM
Comments:
[EVMS SCSIL Maintenance]
EVMS ACS ATLS® Provider 07:30 AM-05:30 PM
Comments:
[EVMS ACS ATLS® Provider]
Training-Matt 12:00 PM-01:30 PM
Comments:
[Training-Matt]
Training-Matt 01:30 PM-03:00 PM
Comments:
[Training-Matt]
ODU PNP CS 08:30 AM-09:00 AM
Comments:
[ODU PNP CS]
EVMS SCSIL PETA Training 09:00 AM-12:00 PM
30 minutes setup time
Comments:
[EVMS SCSIL PETA Training ]
EVMS PA Clinical Assessment & Reasoning I 11:15 AM-05:45 PM
30 minutes setup time
15 minutes teardown time
Comments:
[EVMS PA CAR I]
SP Training Room 12:00 PM-01:30 PM
Comments:
[SP Training Room]
Pediatric Advanced Life Support - UPMC EAST 11:30 AM-02:00 PM
30 minutes setup time
30 minutes teardown time
Comments:
[PALS - UPMC EAST]
PHC: Call Review attendance 07:00 AM-03:00 PM
Comments:
[PHC: Call Review]
JHMC Emergency Dept. and Dental Dept. Sedation/Analgesia for Non-Anethesiologists (With Ketamine & Etomidate) 01:01 AM-12:00 PM
Comments:
[JHMC ED Dental Sedation]
JHMC Education: Sedation/Analgesia for Non-Anesthesiologists 01:01 AM-12:00 PM
Comments:
[JHMC ED Dental Sedation] [JHMC Educ Sedation]
JHMC General Sedation/Analgesia for Non-Anesthesiologists 01:01 AM-12:00 PM
Comments:
[JHMC ED Dental Sedation] [JHMC Educ Sedation] [JHMC Sedation/Analgesia]
Code Narrator - Virtual Class 08:00 AM-04:30 PM
Comments:
[Code Narrator]
IP Testing 08:00 AM-04:30 PM
Comments:
[Code Narrator] [IP Testing]
IP Testing 08:00 AM-04:30 PM
Comments:
[Code Narrator] [IP Testing] [IP Testing]
Medical Student 08:00 AM-04:30 PM
Comments:
[Code Narrator] [IP Testing] [IP Testing] [IP/AMB Medical Student]
OPTIME Pre-OP 08:30 AM-04:00 PM
Comments:
[OPT PRE-OP Nurse]
Video Shoot 08:00 AM-07:00 PM
Comments:
[VID SHOOT]
JABSOM MS3 Transition to Clerkship 08:00 AM-10:00 AM
15 minutes setup time
15 minutes teardown time
Comments:
[JABSOM MS3 Trans Clkshp]
First 5 Minutes: Module 1. What To Do Until the Code Team Arrives - Magee 08:00 AM-09:00 AM
30 minutes setup time
30 minutes teardown time
Comments:
[FIRST 5 MIN 1: CTA - MWH]
Expectations:
Simulation Specialist is REQUIRED